Application for Interconnection of Distributed Generation

Application for Interconnection of Distributed Generation

TIER 1 (LESS THAN 50 KW DC)

Please select the interconnection program you are participating in from the dropdown list.

Participant Information

Participant Name(Required)
Service Address of Qualifying System(Required)

Project Contact

Project Contact Name (if different from participant)
Project Contact Address (if different from participant)

Project Owner

Project Owner Name (if different from participant)
Project Owner Address (if different from participant)

Company Information

Distribute Generation Installation Contractor Company Name(Required)
Company Mailing Address(Required)
Company Representative Name(Required)

Electrical Contractor Information

Electrical Contractor Company Name(Required)
Electrical Contractor Company Address(Required)
Electrical Contractor Representative Name(Required)

Generating Facility Information

MM slash DD slash YYYY
MM slash DD slash YYYY
List of Facility Components and their Certifying Entities(Required)
Equipment Type and Model
Certifying Entity
 
*Click the plus sign at the right of screen to add additional rows as necessary.

Authorization

Section Break

Drop files here or
Accepted file types: pdf, Max. file size: 25 MB, Max. files: 1.

    After completing this application and uploading the required documents, an application fee must be paid to CDE Lightband to facilitate the review.

    To pay application fees make checks payable to Clarksville Department of Electricity, mailed or delivered to 2021 Wilma Rudolph Blvd. Clarksville TN 37040 ATTN: Energy Services Department. Please write “Application for Interconnection” and the project address, if different from address on check, in the note field.

    Application fees are:
    $250.00 for Systems less than 50kW DC (partial kW will be rounded)
    $500.00 for Systems greater than or equal to 50kW DC (partial kW will be rounded)

    This field is for validation purposes and should be left unchanged.