This application is considered complete when it provides all applicable and correct information required below. Inaccurate information will delay approval and could result in higher interconnection costs. The required Application for Interconnection fee must be paid by check, payable to Clarksville Department of Electricity, before the application can be reviewed. All application fees are listed in CDE operating policy 2-5. If a system interconnection study or CDE distribution system modifications are deemed necessary for interconnection after review of this application, then additional charges may be assessed to the applicant before the applicant can continue the interconnection process.
ADDITIONAL INFORMATION – SINGLE LINE DIAGRAM
Provide manufacturer’s specification sheets for the proposed system components to show testing and listing by a Nationally Recognized Laboratory for compliance with the codes and standards outlined in the CDE Distributed Generation Interconnection Procedures. Proof of UL1741 listings must be provided for all applicable equipment. In addition, attach a detailed one-line diagram of the proposed facility, all applicable elementary diagrams, major equipment including: number and location of PV panels, wind turbines, generators, transformers, inverters, AC disconnect switch, circuit breakers, protective relays, batteries and any other components that represent the balance of the system, plus location of existing CDE electric billing meter (unless DPP or Self-Generation where site does not have electric service) and proposed point of interconnection. Include manufacturer’s specifications, test reports and any other applicable drawings or documents necessary for the proper design of the interconnection.
PERMISSION TO INTERCONNECT
Completion of this application does not represent permission to install or interconnect any devices to the CDE Lightband distribution system. Customer must not operate any generating or grid exporting facility until they complete the CDE Lightband Interconnection and Parallel Operations Agreement and receive written authorization from CDE via a CDE-executed CDE Lightband System Acceptance Form. The System Acceptance Form can only be issued after all Code inspections, CDE meter installation, and CDE System Acceptance Test have been completed. Unauthorized parallel operation could result in injury to persons and/or damage to equipment and/or property for which the customer may be liable. NOTE: If the initial commissioning test performed by CDE or TVA personnel does not pass requirements, installer may be subject to additional fees to cover a follow-up inspection.